Articles - LEED RSS Feed

How LEED Delay Impacts LEED for Homes

The process to adopt the next version of LEED has been pushed back according to an announcement by USGBC President and CEO S. Richard Fedrizzi earlier this week. The change means LEED 2012 (now being called LEED v4) will likely not be brought up for a vote on adoption until the middle of next year.

The new standard has already been through four comment periods, with the credit language and the manner in which credits would be evaluated under discussion. There have been revisions in each of these comment periods. A fifth comment period is now scheduled for this fall (October 2 – December 10) and the actual balloting on adoption of LEED v4 is expected to begin June 1, 2013.

Read more »

Design to Embed Value in a Home [Interview]

I caught up with Brian Phillips, principal of Interface Studio Architects, in Miami recently while he was down as a visiting critic at the University of Miami School of Architecture.  Based in Philadelphia, ISA is a prominent architecture and research firm on the leading edge of green building and pre-fab construction with notable projects such as the 100k House and The Modules, featured on Jetson Green a few years ago.  Here is our discussion on the work of ISA and direction of the green building industry.

Read more »

LEED Platinum Shoebox House in Santa Fe

This is The Shoebox House in Santa Fe, New Mexico.  It’s an award-winning design — Citation Award from the Santa Fe chapter of the AIA — that also captured LEED Platinum certification with 88 points, a phenomenal feat given some of the challenges.  Architect and builder Gabe Brown, Praxis Design/Build, was able to put a 1,700 square foot home on a 2,300 square-foot L-shaped lot, while still giving the owner a separate art studio, a gallery-like living room, two bedrooms, two bathrooms, and a study.

Read more »

Page 10 of 158« First...«89101112»203040...Last »

Popular Topics on Jetson Green