Articles - Design RSS Feed

Modern + Green Big Ass Fans

Big_ass_fans_header

I used to workout at one particular gym everyday–you know the drill…elliptical, weights, situps, etc.  Oddly, my body was getting healthier, but I was growing to hate the place for two reasons.  First, the place was dirty and they didn’t provide any cleaners to wipe the machines once you were done.  Second, I had to get surgery on my neck for a staph infection, and later, had a cyst on my arm.  I’m thinking both infections came from unsanitary gym conditions because I was healthy before and have been healthy since.  Anyway.  One day, the atmosphere completely changed, but I couldn’t figure out what it was.  Then it dawned on me that the place wasn’t as musty as it usually was and that was a result of the wonderful "Big Ass Fan."  Seriously, the Big Ass Fan is hard to miss, but it made jumping on that treadmill a dream.  From what I understand, if you do the math, this large, ten-blade piece of ceiling bling can reduce heating + cooling costs (to $.05 /hour). 

HowitworksHere’s the concept:  the large blades, when combined with lower rotation speeds produce a massive, but gentle, breeze to keep the air cool in the summer and warm in the winter.  As you can tell from the pictures, they look pretty good and can be custom painted too.  Since the blades travel at a slower speed, they don’t make that much noise either.  Check out the website and read all the case studies on the website.  There’s an abundance of information that may help you determine whether the Big Ass Fan is suitable for your facility. 

Athletic_8 Aggieland Capital_fitness Athletic_7

Miami Design District's New Green Tower – COR (S2)

Cor_skyline

OPPENheim Architecture + Design just received unanimous approval for a $40 million, 25 story, 380 foot tall, multi-use green tower for Miami’s Design District (4025 NE 2nd Ave., Miami, FL  33137).  It’s called COR and construction will start July 2007 + complete in 2009.  COR will have 113 condominium units, 20,100 square feet of office space, and 5,400 square feet of retail space (includes cafe + furniture store).  Chad Oppenheim designed COR with the assistance of energy consultant Buro Happold + engineer Ysrael Seinuk.  As you can see by looking closely at the pictures, the 10 inch, energy-efficient exoskeleton incorporates wind turbines near the top and provides numerous environmental benefits (thermal mass for insulation, shading, enclosure for terraces).  In addition to wind turbines, the tower will use also photovoltaic panels and solar hot water generation. 

The funky, modern building design is expected to attract creative, design-oriented businesses and trendy, eclectic professionals.  Restaurants and retailers will occupy the ground floor, in an attempt to capture the urban energy of the building.  Of course, the interior will benefit from a mixture of natural sun and shading and design plans call for a high-tech building infrastructure.  Residences will range in size from studio to two-story penthouse units, which range in price from $400,000 to $1 million.  We’re talking about Energy Star appliances, recycled glass tile flooring, bamboo lined hallways, etc.  Residents will have access to the pool and fitness facility as well.  So far, so good I say.  Via Archiseek + Multi-Housing News.

Cor_windmill_top_1 Cor_bottom_2

  UPDATE:  I was hearing from various sources that this project wouldn’t happen.  Now, there’s an interview with Chad Oppenheim about the COR Tower.  This is legit and this is pretty cool. 

Green Office: C2C Certified Steelcase Answer® Workstation

Answer_red_1

Answer.  Thoughtfully flexible.  It’s about time for a new installment to the Green Office segment.  So far, I’ve mentioned the Leap + Think chairs, the Liege Desk, and office supplies from The Green Office.  Enter:  the MBDC Silver Cradle to Cradle Certified, GREENGUARD Indoor Air Quality Certified Steelcase Answer®.  The Steelcase Answer panel workstation is the first C2C Certified powered workstation for the contract furniture industry.  First, Answer uses responsible materials.  Workstation components consist of panels, wood work surfaces, overhead storage and floor-based storage.  There is absolutely no PVC used in its construction.  Second, Cradle to Cradle certification requires product design that contemplates what happens when the product is not longer useful for its intended purpose.  There’s a focus on being able to recycle or safely compost the materials.  Adhesives are eliminated, where possible, and recyclable parts are clearly marked.  This is a big deal considering Answer is one of the best selling systems products in the world.  I bet you could get the Answer workstation penciled into your tenant improvements agreement, right?  Via PRNewswire.

Read more »



Popular Topics on Jetson Green