Articles - August, 2007

Major Milestones for Jetson Green

This is just a quick administrative post on the status of Jetson Green.  I’m pleased to announce that Jetson Green has come upon two major milestones:  (1) passing the 100,000 unique visitors threshold + (2) passing the one year mark in existence.  As another interesting note, this post is number 400 for Jetson Green.  I’m proud of these achievements, but I want to thank the readers of Jetson Green.  We’re currently hovering around 900 readers in the feed, so this website is becoming considerable in reach.  As you can see from the graph below, it just keeps growing and improving.  I think these numbers are incredible, especially because this is a one-person endeavor and we haven’t hit the front page of digg (or similar).

Read more »

Windermere West – Chicago Slanting Windows (S2)

Windermere West - Click to View Larger Wired has an interesting story about a new 26-story tower soon to be built in Chicago’s Hyde Park called Windermere West.  The building was designed by Jeanne Gang, with a little help from Arup.  Here’s the idea:  the hottest sun of the year is the highest in the sky and this is when electricity bills skyrocket.  So, Gang designed this sawtooth facade effect for roughly 2/3 of the south-facing balconies.  At a 71 degree tilt, the glass is angled enough to shade the interiors during that hot period of the day, but not so much that people feel like they will tip over into the streets.  Pretty neat?!  I wonder if this is actually going to get built.  It’s interesting to see how architects come up with creative solutions to incorporating natural light in just the right way. 

::"S2" is short for "Skyscraper Sunday," a weekly article on green skyscrapers posted every Sunday::

Powerfully Small and Green Ideabox

Ideabox

"It's like a loft you can take anywhere.Ideabox offers a pretty cool product in the modern, prefabricated housing industry.  Ideabox emphasizes good design, not square footage, and they make it easy to do.  With Ideabox, you're going to get the entire package right to your site.  There's one day to install it, one day to build the deck, and that's about it.  Depending on your site, all you really need to do is set up the water, power, septic, and sewer systems.  You can even go wireless with the turnkey solar system package, too. 

Read more »

Page 8 of 16« First...«678910»...Last »

Popular Topics on Jetson Green